
Denso's Steelcoat 400™ System applied to a 700 metre above ground pipeline.

Denso's Steelcoat 400™ System applied to a 700 metre above ground pipeline.

Denso's Steelcoat 400™ System applied to a 700 metre above ground pipeline.

Denso's Steelcoat 400™ System applied to a 700 metre above ground pipeline.

Denso's Steelcoat 100™ System offering land side protection to sheet piles at Mayfield.

Denso's Steelcoat 100™ System offering land side protection to sheet piles at Mayfield.

Denso's Steelcoat 100™ System offering land side protection to sheet piles at Mayfield.

The completed box beam.

Ultraseal Tape Application.

Conforming Tape for profiling complex shapes.

Bare roller showing no signs of corrosion

Bare roller showing no signs of corrosion

After application of the Denso™ Petrolatum Tape System.

Before application of the Denso™ Petrolatum Tape System.

The Denso™ Petrolatum Tape System.

Application of Protal 7200 to the pipeline

A section of the new gas main under construction

Denso Protal 7200 being applied to protect the gas main field joints