CASE STUDY
SeaShield 2000FD™ and SeaShield 100™ combination system for steel pile protection
Subsea & Splash Zone Coatings
Project Data
Location | NSW |
Asset Owner | Withheld |
Systems | SeaShield 2000FD™ and SeaShield 100™ systems. |
Date | 2023 |
Denso Australia recently completed a project in NSW involving the use of SeaShield 2000FD™ and SeaShield 100™ systems. In total, the project involved pile wrapping of close to 30 steel piles with various diameters and lengths of coverage.
In addition to wrapping the facility’s mooring and fender piles, several of the piles had new repositioned mooring hooks and fender brackets incorporated into their design. With the mooring hooks and brackets creating an obstruction on several of the piles, we knew that the SeaShield 2000FD™ system would not be the sole corrosion protection solution required.
In these instances, the piles required a combination of the two SeaShield systems to be used together with the SeaShield 100™ system being applied to cover areas of these piles in which the SeaShield 2000FD system couldn’t be cut or modified to protect.
This recent project not only marks the first time our two SeaShield systems have been used together in this way, but is also yet another excellent showcase for the innovative ‘made-to-measure’ solutions that Denso Australia are able to provide. In doing so, the project was completed successfully and the contractor has since relayed the asset owner’s high level of satisfaction with both the final appearance of the SeaShield application as well as the overall outcome!